Software Release Management Best Practices

Software Release Management Best Practices

Software Release Management Best Practices

What is software release management?

At its most general, “releasing software” is the process by

which software is delivered from the engineers creating it to its

users. This can take such forms as:

  • A boxed product shipped on some kind of physical media

  • A downloadable executable on a website

  • A mobile application from the official store for your device

  • A remotely accessible network service, especially web applications

All releases are managed in some way, but there's a wide

spectrum available for the thoroughness of this management. One

extreme would be the software used on an aircraft or space shuttle.

The software will be rigorously tested, following a strict process.

It will require sign-off from many different people to ensure

proper quality metrics and functional requirements have been met.

Only after this thorough and well documented process is complete

will the software touch the actual hardware in-flight.

By contrast, if you've got a website, you may telnet (or, if

you're really fancy, SSH) into your web server, use

nano to open up index.php, make some

changes, and “release” your software by hitting save.

The former process is vital when lives and millions of dollars

of equipment are in the balance. However, for run-of-the-mill

software projects, such a high overhead would likely be daunting

and overly costly. The latter process (if we can even call it that)

is just barely sufficient for managing the most amateur of

projects, but introduces substantial risk of security holes,

downtime, and lost work, which on almost all projects will be

unacceptable.

Understanding the trade-offs in release management and the

requirements of your project is an important part of designing the

release process for your project. As you've likely noticed, the

trade-off here is between the cost of high quality versus its

benefit. In addition to navigating the overall trade-off, this post

will give some advice on tooling and approaches that will reduce

the overall cost of good process, making it possible—to some

extent—to have your cake and eat it too.

Release Management Process Flow

Taking the broadest view, release management is a process that

starts at the requirements phase, and lasts until a successful

release. As a motivating example, we'll use the case of adding some

basic functionality to an existing website. The process looks

something like this:

  1. Define the requirements for the upcoming

    release. In our example: add a visitor counter to the homepage

    (we're going retro). The visitor counter must work on both desktop

    browsers and mobile devices.

  2. State some concrete acceptance criterion. This

    will be testable assertions based on the requirements. This may be

    in the form of automated test cases (perhaps using Selenium for our

    example), or a manual test script to be run through. It would

    include details like:

    • Counter displays in browser

    • Refreshing the page increments the visitor count

    • Counter displays on mobile device

  3. Deployments are made to a staging server. Such

    deployments can be triggered by pushes to a special branch or

    manual intervention. The goals should be:

    • The staging environment is as close as possible to the

      production environment to minimize surprises when switching to

      production.

    • Deployments are a cheap activity, requiring as little human involvement as possible.

    This is where we recommend taking advantage of modern devops

    techniques, with such methods as immutable

    infrastructure and declarative

    architecture.

  4. Quality Assurance (QA) reviews the staging environment to see if

    it meets the acceptance criteria. QA should not only be testing the

    new features, but also all old features as well to avoid

    regressions. Once again, automated is better than manual, but some

    manual testing may be necessary. Make sure you're not just

    performing success tests, but include

    failure tests, randomized tests, and much more in your test

    scripts.

  5. After proper sign-off from QA, deploy the new software to

    production. Once again, devops comes into play, and an ideal

    deployment will include these ideas.

    • Use the same binary artifacts on production as were used on the

      staging system. Containerization helps

      make this easy, by packaging up all of your artifacts into a single

      image.

    • Minimize (or eliminate) downtime by performing a blue/green

      deployment. Update some of the machines in your cluster to the new

      image, ensure they are responsive, and after a critical mass is up

      and running, atomically switch your load balancer to point at the

      new images. Kubernetes's deployment concept can help with this

      (though you'll still need to consider shared mutable resources,

      like how to update a database schema).

As you can see from these steps, we're defining release

management to be a broad role. The release management objectives in

this sense are to ensure that the code that ends up being released

to users properly implements the new requirements, without

introducing new regressions. This is a process that encompasses

devops, QA, and software development. Importantly:

No one team can be singularly responsible for a successful release

You may (rightfully) point out that not all of the steps above

are present in the release management of a lot of software in the

world. What I'm describing is a minimal set of steps that maximize

the benefit of a process while minimizing its costs, for projects

of common size and common quality requirements. If you're throwing

together a static homepage and don't care if the layout sometimes

breaks: this process is likely overkill. If you're NASA, it's far

too little.

Development

You may have noticed that development is conspicuously missing

from the process above. In practice, it occurs between steps 2 and

3 above. I've left it out of this list, however, as it's not truly

part of release management. The development process is external to

release management and provides it input (source code to

build/test/deploy), in much the same way as business decision

activities are external to release management, only interacting

with the process by ultimately defining clear requirements.

Roles and Responsibilities

Some roles naturally fall out of the steps listed above.

  • The product owner is responsible for defining the requirements for a release.

  • The quality manager is responsible for

    ensuring that the acceptance criteria accurately represent the

    requirements. It should be impossible for a piece of code to pass

    the acceptance criteria but leave the product owner unhappy with

    the result. The quality manager is also responsible for ensuring

    that tests are both properly and efficiently run, avoiding false

    positives and false negatives, and giving the development team

    accurate feedback on outstanding work items.

  • The devops team is responsible for maintaining

    a continuous integration/continuous deployment setup that will

    allow the development team to iterate rapidly, and the quality team

    to have confidence that their tests on staging will carry through

    to production. The team is also responsible for providing a high

    availability production deployment that allows for minimal downtime

    in new deployments.

Software Release Management Best Practices

The process above leads to some natural best practices.

  • Automate as much as possible, both on the

    devops and testing side. Automation cuts down on the human cost,

    allowing more rapid iteration, and reduces the chance for false

    positives and negatives (computers tend to make less mistakes than

    humans).

  • Have clear requirements, and from these make testable acceptance criteria. There should be no ambiguity about whether the software is ready to ship.

  • Minimize user impact of a release by minimizing or eliminating downtime and testing for regressions before release.

  • Make things immutable wherever possible.

    Instead of modifying the configuration of an existing machine,

    deploy a complete image that contains all of the configuration.

    This avoids bugs from appearing due to an unexpected series of

    actions. (It's probably not surprising for a functional programming team to recommend

    immutability.)

Best Release Management Tools

There are many tools out there to help with all of the above.

Here are some of our favorite at FP Complete, which we use

regularly to help our customers bring their

projects to completion:

  • Terraform allows a devops engineering to

    declaratively state what their cloud architecture should look like,

    and takes care of the mutable API calls for you behind the

    scene.

  • Kubernetes manages the deployment of your

    Docker images across a cluster of machines, and helps avoid

    downtime with its rolling deployment system.

  • Selenium and other automated testing tools are

    invaluable for a quality team. The exact tool will depend

    substantially on the problem domain being faced. Selenium, for

    example, is great for front end web development, but does nothing

    to help with stress testing a server. Don't forget to use your language's own functionality for

    testing.

  • A continuous integration system with in-repo

    configuration. We've had a lot of success with

    Gitlab, though other tools like Jenkins are certainly options as well.

  • Monitoring and alerting throughout the release process via

    Prometheus to provide invaluable insights into the running system,

    in case something went wrong.